91视频国产_国产精品第13页_久久久久久久久人体_国产欧美日韩一区二区三区

中國(guó)給水排水2021年中國(guó)污水處理廠提標(biāo)改造(污水處理提質(zhì)增效)高級(jí)研討會(huì) (第五屆)邀請(qǐng)函暨征稿啟事
 
當(dāng)前位置: 首頁(yè) » 行業(yè)資訊 » 水業(yè)新聞 » 正文

山西某污水處理廠提標(biāo)擴(kuò)容改造工程設(shè)計(jì) 伍波, 周軍寶, 葉昌明* (深圳市清泉水業(yè)股份有限公司,深圳518116)

放大字體  縮小字體 發(fā)布日期:2018-08-06  瀏覽次數(shù):98
核心提示: 山西某污水處理廠提標(biāo)擴(kuò)容改造工程設(shè)計(jì) 伍波, 周軍寶, 葉昌明* (深圳市清泉水業(yè)股份有限公司,深圳518116)
中國(guó)給水排水2021年中國(guó)排水管網(wǎng)大會(huì)(水環(huán)境綜合治理)邀請(qǐng)函(污水千人大會(huì)同期會(huì)議)

中國(guó)給水排水2021年中國(guó)污水處理廠提標(biāo)改造(污水處理提質(zhì)增效)高級(jí)研討會(huì)
 山西某污水處理廠提標(biāo)擴(kuò)容改造工程設(shè)計(jì)

伍波, 周軍寶, 葉昌明*

(深圳市清泉水業(yè)股份有限公司,深圳518116

摘要:山西某污水處理廠通過將原SBR+BAF+砂濾池工藝改造為ABM短時(shí)泥膜法[AAO(活性污泥法)、BAF(曝氣生物濾池)和MDF(多功能深床濾池)組合工藝]污水處理工藝后,其設(shè)計(jì)規(guī)模從5000m3/d增加至10000m3/d,出水水質(zhì)主要指標(biāo)由《城鎮(zhèn)污水廠污染物排放標(biāo)準(zhǔn)》(GB18918-2002)一級(jí)B提高至地表類。利用原構(gòu)筑物進(jìn)行改造,同時(shí)新建模塊化標(biāo)準(zhǔn)件廠房以增加污水處理廠產(chǎn)水量,縮短了施工周期。詳細(xì)介紹了該工程概況、原工藝存在的問題、改造思路以及設(shè)計(jì)總結(jié)。

關(guān)鍵詞:提標(biāo)擴(kuò)容改造;ABM短時(shí)泥膜法;BAF模塊;MDF模塊;地表

中圖分類號(hào):TU992文獻(xiàn)標(biāo)識(shí)碼C   

Design of Upgrading Reconstruction and Capacity Expansion of a Wastewater Treatment Plant in Shanxi

WU Bo, ZHOU Jun-bao, YE Chang-ming

(Shenzhen Qingquan Water Industry Co. Ltd., Shenzhen 518116, China)

Abstract: A wastewater treatment plant in Shanxi had transformed the original SBR+BAF+ sand filter process into ABM short-time sludge membrane method (that were AAO (activated sludge process), BAF (aeration biological filter) and MDF (multi-function deep bed filter) combined process). The design capacity of the object could be added from 5000m3/d to 10000m3/d, and the main index of effluent quality could be increasedfrom the first level B criteria specified in the Discharge Standard of Pollutants for Municipal Wastewater treatment Plant (GB 18918-2002) to the specified water standard level . Rebuilt the original structure and built a modular factory building at the same time, that to increase the water output of the sewage treatment plant and short the construction period. The general situation of the project, the problems existing in the original technology, the reform ideas and the design summary weredetailedlyintroduced.

Key words: upgrading reconstruction and capacity expansion; ABM short-term sludge membrane method; BAF module; MDF module; the specified water standard level 



*通訊作者:葉昌明,高級(jí)工程師 

 
微信掃一掃關(guān)注中國(guó)水業(yè)網(wǎng)/>
</div>
<div   id= 
 
[ 行業(yè)資訊搜索 ]  [ ]  [ 打印本文 ]  [ 關(guān)閉窗口 ]

 
0條 [查看全部]  相關(guān)評(píng)論

 
推薦圖文
推薦行業(yè)資訊
點(diǎn)擊排行