[1]石蘭蘭,張寶林,吳云生,等.深圳橫嶺污水廠提標中曝氣生物濾池的升級及應用[J].中國給水排水,2020,36(14):104-108.
SHI Lan-lan,ZHANG Bao-lin,WU Yun-sheng,et al.Upgrading and Application of Biological Aerated Filter in Upgrading of Shenzhen Hengling Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(14):104-108.
點擊復制
SHI Lan-lan,ZHANG Bao-lin,WU Yun-sheng,et al.Upgrading and Application of Biological Aerated Filter in Upgrading of Shenzhen Hengling Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(14):104-108.
深圳橫嶺污水廠提標中曝氣生物濾池的升級及應用
中國給水排水[ISSN:1000-4062/CN:12-1073/TU] 卷: 第36卷 期數(shù): 2020年第14期 頁碼: 104-108 欄目: 出版日期: 2020-07-17
- Title:
- Upgrading and Application of Biological Aerated Filter in Upgrading of Shenzhen Hengling Wastewater Treatment Plant
摘要:- 深圳橫嶺污水廠二期(40×104 m3/d)工程原污水處理主工藝采用強化預處理加反硝化、硝化兩級曝氣生物濾池和紫外消毒工藝,
原出水水質執(zhí)行一級A排放標準。2018年應廣東省環(huán)保廳要求,啟動地表準Ⅳ類提標工程。同時,為改善現(xiàn)有系統(tǒng)預處理水力及固體負荷偏高,濾料破損、板結導致加大濾池水損及曝氣不均等運行問題,提標工程設計采用新建濾池反沖洗水處理工藝以降低預處理負荷,主工藝流程為兩級曝氣濾池改造加新建反硝化濾池、新建高負荷混凝沉淀池工藝,實現(xiàn)深度脫氮及除磷要求。新建深度處理工段具有設計負荷高、節(jié)省占地、處理效果可靠、工藝先進的特點,適用于用地受限的提標工程。
Abstract:- The phase Ⅱ project of Shenzhen Hengling wastewater treatment plant (400 000 m3/d) adopted the enhanced pretreatment, denitrification, nitrification two-stage biological aerated filter and ultraviolet disinfection process, and the original effluent standard was required to reach the first level A. According to the request of Guangdong Provincial Environmental Protection Department, a quasi Ⅳ standard upgrading project was conducted in 2018. In order to solve the operation problems of high hydraulic and solid loading of pretreatment, filter water loss due to breakage and hardening of filter material, and uneven aeration, the upgrading project adopted the new filter backwash water treatment process to decrease the load of pretreatment. The main process included the renovation of the two-stage aeration filter and the construction of a new denitrification filter and a new high load coagulation sedimentation tank to realize the deep nitrogen and phosphorus removal requirements. The new advanced treatment section had advantages of high design load, low occupation of land, reliable treatment performance and advanced technology, which was suitable for land-restricted upgrading projects.