CHEN Si-li,CHANG Sha,BING Yong-xin,et al.Application of Biological Contact Oxidation Process and Constructed Wetland in Ex-situ Treatment of PollutedRiver Water[J].China Water & Wastewater,2018,34(22):47-50.
接觸氧化+人工濕地工藝異位處理受污染河水
- Title:
- Application of Biological Contact Oxidation Process and Constructed Wetland in Ex-situ Treatment of PollutedRiver Water
- 文章編號(hào):
- 1000-4602(2018)22-0047-04
- Keywords:
- biological contact oxidation; constructed wetland; ex-situ treatment process; polluted river water
分類號(hào):- TU992.3
- 文獻(xiàn)標(biāo)志碼:
- C
- 摘要:
- 廣東省茂名市某河道人工濕地工程處理規(guī)模為10 000 m3/d,進(jìn)水BOD5/COD值為0.3,可生化性好,采用接觸氧化+人工濕地工藝處理受污染河水。運(yùn)行結(jié)果表明,該工藝運(yùn)行穩(wěn)定,出水主要指標(biāo)達(dá)到《地表水環(huán)境質(zhì)量標(biāo)準(zhǔn)》(GB 3838—2002)Ⅴ類水標(biāo)準(zhǔn)(氨氮≤4.4 mg/L)。工程總投資為1 500萬(wàn)元,運(yùn)行及日常維護(hù)簡(jiǎn)單,年運(yùn)行費(fèi)用為190.81萬(wàn)元,運(yùn)行成本為0.523 元/m3。
Abstract:- The treatment capacity of an ex-situ treatment constructed wetland in Maoming City in Guangdong Province was 10 000 m3/d, which was built for treating polluted river water. The influent BOD5/COD was 0.3, which meant that the river water had good biodegradability. The combined process of biological contact oxidation unit followed by constructed wetland was used to treat the polluted river water. The treatment performance of the treatment process was stable, and effluent quality could meet the class V criteria specified in the Environmental Quality Standards for Surface Water(GB 3838-2002)with ammonia nitrogen no more than 4.4 mg/L.The total investment was 15 million yuan, and the annual operating cost operating cost were both as low as 1.908 1 million yuan and 0.523 yuan/m3 due to the simple operation and maintenance.
參考文獻(xiàn)/References:
[1] 李大鵬,黃勇,李偉光. 底泥曝氣改善城市河流水質(zhì)的研究[J]. 中國(guó)給水排水,2007,23(5):22-25. Li Dapeng,Huang Yong,Li Weiguang. Study on remediation of city river water body by technology of aerating sed-iments[J]. China Water & Wastewater,2007,23(5):22-25(in Chinese).
[2] Paul S G. River restoration:Seeking ecological standards[J]. J Appl Ecol,2005,42(2):201-207.
[3] 楊逢樂(lè). 人工濕地技術(shù)治理河道污水工程試驗(yàn)研究[D]. 昆明:昆明理工大學(xué),2008. Yang Fengle. Engineering Experiment for Treating Polluted River through Constructed Wetland[D]. Kunming:Kunming University of Science and Technology,2008(in Chinese).
[4] 趙聯(lián)芳,朱偉,趙建. 人工濕地處理低碳氮比污染河水時(shí)的脫氮機(jī)理[J]. 環(huán)境科學(xué)學(xué)報(bào),2006,26(11):1821-1827. Zhao Lianfang,Zhu Wei,Zhao Jian. Nitrogen removal me-chanism in constructed wetland used for treating polluted river water with lower ratio of carbon to nitrogen[J]. Acta Scientiae Circumstantiae,2006,26(11):1821-1827(in Chinese).
相似文獻(xiàn)/References:
[1]張信武.某危廢處置企業(yè)廢水站技術(shù)改造實(shí)例[J].中國(guó)給水排水,2021,37(2):104.
ZHANG Xin-wu.Technology Improvement Example of Wastewater Treatment Station in a Hazardous Waste Disposal Plant[J].China Water & Wastewater,2021,37(22):104.
[2]郭榮華,吳寅,尹玲煥,等.某鋼鐵廠綜合廢水深度凈化工程實(shí)例[J].中國(guó)給水排水,2021,37(18):116.
GUO Rong-hua,WU Yin,YIN Ling-huan,et al.Case Study on Advanced Treatment of Wastewater from a Steelworks[J].China Water & Wastewater,2021,37(22):116.
備注/Memo
基金項(xiàng)目: 廣東省科技計(jì)劃項(xiàng)目-應(yīng)用型科技研發(fā)專項(xiàng)(2016B020240007); 中央級(jí)公益性科研院所基本科研業(yè)務(wù)專項(xiàng)(PM-zx097-201701-033)
通信作者: 張政科 E-mail:zhangzhengke@scies.org
作者簡(jiǎn)介:陳思莉(1982- ), 女, 廣東梅州人, 碩士, 高級(jí)工程師, 主要從事水污染技術(shù)研究控制與設(shè)計(jì)及環(huán)境風(fēng)險(xiǎn)應(yīng)急等工作。 E-mail:chensili@scies.org
收稿日期:2018-05-02
近期發(fā)表