CAILu,CHENJun,FENGHao.Discussion on Key Design Parameter of Municipal Sludge Aerobic Fermentation Project: Fermentation Cycle[J].China Water & Wastewater,2022,38(18):72-77.
城市污泥好氧發(fā)酵工程關(guān)鍵設計參數(shù)發(fā)酵周期探討
- Title:
- Discussion on Key Design Parameter of Municipal Sludge Aerobic Fermentation Project: Fermentation Cycle
- Keywords:
- sludge; aerobic fermentation; composting; drying; fermentation cycle; maturity
- 摘要:
- 發(fā)酵周期是決定城市污泥好氧發(fā)酵工程能否達到預期運行效果的關(guān)鍵設計參數(shù),也是影響工程占地面積和工程造價的重要參數(shù)。從脫水減量化、高溫無害化、穩(wěn)定腐熟化等角度,結(jié)合發(fā)酵產(chǎn)物用途、標準要求和工程實踐,探討適宜的好氧發(fā)酵周期,為工程設計提供借鑒。研究表明,至少15 d的主發(fā)酵周期才能達到脫水減量化和無害化部分指標要求。若產(chǎn)物用于焚燒,主發(fā)酵周期可設為15 d;若用于土地改良,主發(fā)酵周期至少設為20 d;若進行農(nóng)林地利用,建議主發(fā)酵后接續(xù)后腐熟,全周期至少設為30 d。因此,在工程實踐中,主發(fā)酵周期至少設為15 d,后腐熟時間可根據(jù)產(chǎn)物用途設為5~15 d或更長。
Abstract:- Fermentation cycle is a key design parameter that determines whether the municipal sludge aerobic fermentation project can achieve the expected performance, and also an important parameter that affects the project footprint area and construction investment. From the aspects of dehydration reduction, microbial inactivation and maturity, the suitable aerobic fermentation cycle was discussed based on the product applications, standard requirements and engineering practices, which aimed to provide reference for engineering design. The main fermentation cycle to meet part of the dehydration reduction and microbial inactivation index requirements should be at least 15 days. If the product was used for incineration, the main fermentation cycle could be set to 15 days, and at least 20 days for soil conditioner. If the product was used as fertilizer in farmland or forestland, it was recommended that the whole cycle of main fermentation and subsequent maturity should be at least 30 days. In engineering practice, the main fermentation cycle should be at least 15 days, and the maturity cycle could be set to 5-15 days or longer depending on the use of the product.
相似文獻/References:
[1]劉常青,陳琬,曾藝芳,等.SARD與CSTR反應器半連續(xù)發(fā)酵產(chǎn)氫能力對比[J].中國給水排水,2018,34(21):7.
LIU Chang qing,CHEN Wan,ZENG Yi fang,et al.Hydrogen Production Capacity of Semi continuous Fermentation of SARD and CSTR Bio hydrogen Production Reactor[J].China Water & Wastewater,2018,34(18):7.
[2]顏瑩瑩,梁遠,沙雪華,等.新冠肺炎疫情下關(guān)于減少污泥中病原體的思考[J].中國給水排水,2020,36(6):22.
[3]郭波,田瑜,范晨,等.綠色納米鐵/H2O2聯(lián)用兩性脫水劑調(diào)理污泥研究[J].中國給水排水,2020,36(13):62.
GUO Bo,TIAN Yu,FAN Chen,et al. Sludge Conditioning by Green Iron Nanoparticles/H2O2 Combined with Amphoteric Dewatering Agent [J].China Water & Wastewater,2020,36(18):62.
[4]許勁,范準,呂秋穎,等.山地城市污泥水熱炭化產(chǎn)物特性研究[J].中國給水排水,2020,36(21):21.
XU Jin,FAN Zhun,L Qiu-ying,et al.Characteristics of Hydrothermal Carbonization Products of Municipal Sludge in Mountainous Cities[J].China Water & Wastewater,2020,36(18):21.
[5]李金河,張波濤,劉寶玉,等.污泥中溫厭氧消化最佳溫度及改善機理分析[J].中國給水排水,2021,37(3):9.
LI Jin-he,ZHANG Bo-tao,LIU Bao-yu,et al.Optimal Reaction Temperature in Mesophilic Anaerobic Digestion of Waste Activated Sludge and Its Promotion Mechanism[J].China Water & Wastewater,2021,37(18):9.
[6]王麗花,呂國鈞,王飛,等.污泥干化焚燒系統(tǒng)的節(jié)能降耗研究[J].中國給水排水,2021,37(4):29.
WANG Li-hua,Lü Guo-jun,WANG Fei,et al.Research on Energy Saving and Consumption Reduction of Sludge Drying and Incineration System[J].China Water & Wastewater,2021,37(18):29.
[7]紀莎莎,黃瑾.污泥焚燒工程中的磷形態(tài)分布與磷遷移研究[J].中國給水排水,2021,37(5):26.
JI Sha-sha,HUANG Jin.Phosphorus Forms Distribution and Migration in Sludge Incineration Project[J].China Water & Wastewater,2021,37(18):26.
[8]馬彩霞,劉蕾,李碧清,等.強化化學淋濾對污泥重金屬溶出及磷釋放的影響[J].中國給水排水,2021,37(5):66.
MA Cai-xia,LIU Lei,LI Bi-qing,et al.Effect of Enhanced Chemical Leaching on Heavy Metal Dissolution and Phosphorus Release from Sludge[J].China Water & Wastewater,2021,37(18):66.
[9]李偉,常菁,王佳偉,等.熱水解高級厭氧消化系統(tǒng)的污泥消毒、減量與能量回收[J].中國給水排水,2021,37(16):19.
LI Wei,CHANG Jing,WANG Jia-wei,et al.Sludge Disinfection, Reduction and Energy Recovery by Anaerobic Digestion with Thermal Hydrolysis Pretreatment[J].China Water & Wastewater,2021,37(18):19.
[10]胡佩佩,侯鋒,范瑩,等.深度脫水污泥好氧發(fā)酵工藝研究[J].中國給水排水,2021,37(17):74.
HU Pei-pei,HOU Feng,FAN Ying,et al.Aerobic Fermentation Process of Deep Dewatering Sludge[J].China Water & Wastewater,2021,37(18):74.