重慶市御臨河?xùn)|岸一級(jí)截污干管工程設(shè)計(jì) 李良富1,林學(xué)山2,郭成林1,那貴平1 (1.中機(jī)中聯(lián)工程有限公司,重慶400039;2.重慶電子工程職業(yè)學(xué)院建筑與村料學(xué)院,重慶401331)
重慶市御臨河?xùn)|岸一級(jí)截污干管工程設(shè)計(jì)
[1]李良富,林學(xué)山,郭成林,等.重慶市御臨河?xùn)|岸一級(jí)截污干管工程設(shè)計(jì)[J].中國(guó)給水排水,2020,36(20):63-66.
LI Liang-fu,LIN Xue-shan,GUO Cheng-lin,et al.Design of the Primary Sewage Interceptor Project on the East Bank of Yulin River in Chongqing[J].China Water & Wastewater,2020,36(20):63-66.
點(diǎn)擊復(fù)制
LI Liang-fu,LIN Xue-shan,GUO Cheng-lin,et al.Design of the Primary Sewage Interceptor Project on the East Bank of Yulin River in Chongqing[J].China Water & Wastewater,2020,36(20):63-66.
重慶市御臨河?xùn)|岸一級(jí)截污干管工程設(shè)計(jì)
中國(guó)給水排水[ISSN:1000-4062/CN:12-1073/TU] 卷: 第36卷 期數(shù): 2020年第20期 頁(yè)碼: 63-66 欄目: 出版日期: 2020-10-17
- Title:
- Design of the Primary Sewage Interceptor Project on the East Bank of Yulin River in Chongqing
- 關(guān)鍵詞:
- 一級(jí)截污干管; 超深檢查井; 頂管工程設(shè)計(jì)
- Keywords:
- primary sewage intercepting pipeline; ultra-deep inspection well; pipe jacking engineering design
- 摘要:
- 隨著國(guó)家對(duì)水環(huán)境質(zhì)量的重視,在城市開(kāi)發(fā)區(qū)路網(wǎng)工程建設(shè)時(shí)同步建設(shè)截污干管系統(tǒng)已非常必要。在重慶市兩江新區(qū)復(fù)盛片區(qū)開(kāi)發(fā)建設(shè)過(guò)程中,截污干管系統(tǒng)的設(shè)計(jì)建設(shè)也同步推進(jìn)。從設(shè)計(jì)原則、控制性因素分析、截污干管系統(tǒng)總體設(shè)計(jì)、平面設(shè)計(jì)、縱斷設(shè)計(jì)、超深檢查井設(shè)計(jì)、頂管工程設(shè)計(jì)等方面介紹了重慶市御臨河?xùn)|岸一級(jí)截污干管工程的設(shè)計(jì)情況,可為后續(xù)類似項(xiàng)目的排水工程設(shè)計(jì)提供參考。
- Abstract:
- With the increasing attention to the quality of water environment in China, it is necessary to construct the sewage intercepting pipeline system in road network construction of urban development zone. With the development of Fusheng area in Liangjiang New District of Chongqing, the design and construction of the sewage intercepting pipeline system are also in progress. This paper introduces the design of the primary intercepting pipeline construction of the eastern bank of Yulin River in Chongqing from the aspects of design principles, analysis of controlling factors, overall design of the sewage intercepting pipeline system, graphic design, longitudinal section design, ultra-deep inspection well design, and pipe jacking engineering design, which can provide references for future similar projects with drainage engineering design.
更新日期/Last Update: 2020-10-17