91视频国产_国产精品第13页_久久久久久久久人体_国产欧美日韩一区二区三区

中國給水排水2024年城鎮(zhèn)污泥處理處置技術(shù)與應(yīng)用高級研討會(第十五屆)邀請函 (同期召開固廢滲濾液大會、工業(yè)污泥大會、高濃度難降解工業(yè)廢水處理大會)
 
當(dāng)前位置: 首頁 » 行業(yè)資訊 » 水業(yè)新聞 » 正文

Tuas Nexus – Singapore’s First Integrated Water and Solid Waste Treatment Facility Begins Constructi

放大字體  縮小字體 發(fā)布日期:2023-09-23  來源:Tuas Nexus – Singapore’s First  瀏覽次數(shù):139
核心提示:Tuas Nexus – Singapore’s First Integrated Water and Solid Waste Treatment Facility Begins Construction 08 Sep 2020 Collectively known as Tuas Nexus, the integration of the Tuas Water Reclamation Plant (Tuas WRP) and the Integrated Waste Management Fac
中國給水排水2024年城鎮(zhèn)污泥處理處置技術(shù)與應(yīng)用高級研討會(第十五屆)邀請函 (同期召開固廢滲濾液大會、工業(yè)污泥大會、高濃度難降解工業(yè)廢水處理大會)

中國給水排水2024年城鎮(zhèn)污泥處理處置技術(shù)與應(yīng)用高級研討會(第十五屆)邀請函 (同期召開固廢滲濾液大會、工業(yè)污泥大會、高濃度難降解工業(yè)廢水處理大會)
 
















Tuas Nexus – Singapore’s First Integrated Water and Solid Waste Treatment Facility Begins Construction

08 Sep 2020

 

Collectively known as Tuas Nexus, the integration of the Tuas Water Reclamation Plant (Tuas WRP) and the Integrated Waste Management Facility (IWMF) is an innovative and sustainable solution to meet Singapore’s long-term solid waste management and used water treatment needs

JOINT NEWS RELEASE BETWEEN PUB AND NEA 

Singapore, 8 September 2020 – The National Environment Agency (NEA) and PUB, Singapore’s National Water Agency, have announced that the first phase of construction of Tuas Nexus has begun, and it is set to be completed in phases from 2025 onwards. The co-location of two mega facilities – the Tuas WRP and IWMF – will help forge a more sustainable Singapore by optimising land use and maximising energy and resource recovery. 

2          The world’s first integrated waste and water treatment facility to be conceptualised and planned from the ground-up, Tuas Nexus (refer to Annex A for the artist’s impression and infographic of Tuas Nexus) will be energy self-sufficient by harnessing synergies from Tuas WRP and IWMF. This is expected to result in carbon savings of more than 200,000 tonnes of CO2 annually, equivalent to taking 42,500 cars off Singapore’s roads. In addition, integrating both facilities will result in land savings of up to 2.6 hectares – about the size of four football fields, as compared to building the two as standalone facilities.

Tuas WRP – PUB’s answer to closing the water loop more effectively

3          Tuas WRP, a key component of PUB’s Deep Tunnel Sewerage System (DTSS) Phase 2 project, will have an initial treatment capacity of 800,000m3 per day – the equivalent of 320 Olympic-sized swimming pools of water. Unlike conventional water treatment plants, it is equipped to receive both domestic and industrial used water streams from two separate deep tunnels for treatment. In a first for Singapore, Tuas WRP (refer to Annex B for more info) will also be capable of treating industrial used water to a sufficiently high standard for industries’ use.

4          Besides incorporating advanced physical, biological and chemical treatment processes, Tuas WRP will also house the largest membrane bioreactor facility in the world – this will enable the plant to be more energy efficient while occupying less space compared to existing water treatment plants and avoid the need for a long sea outfall. A NEWater factory to be built on the rooftop of Tuas WRP will significantly boost PUB’s NEWater production capability, further ensuring a robust and resilient supply of water for Singapore that can meet growing water demand and cope with the impact of climate change.

5          Said Mr Ng Joo Hee, Chief Executive, PUB, “By itself, PUB’s Tuas WRP would already be breaking new ground, including housing the world’s largest membrane bioreactor. But when coupled with the NEA’s IWMF to form the Tuas Nexus, it would be so much more. We are building Tuas Nexus because it is the smart thing to do, as the sum would be far greater than its two parts. I believe the Tuas Nexus advances the state-of-the-art in sustainable urban waste management and resource recovery, and establishes a new international benchmark for the field.”

IWMF - NEA’s response plan to meeting Singapore’s solid waste management needs

6          IWMF is an integral part of NEA’s long-term plan (refer to Annex C for more info) to meet Singapore’s solid waste management needs. It will be equipped with state-of-the-art solid waste treatment technologies to improve energy and resource recovery from waste. It is Singapore’s first integrated facility to treat incinerable waste, source-segregated food waste and dewatered sludge from Tuas WRP, as well as to sort household recyclables collected under the National Recycling Programme (NRP).

7          Besides being Singapore’s largest waste incineration plant when fully completed, IWMF will also be the most energy efficient yet, and for the first time, integrate an operational food waste treatment facility and sludge incineration facility to achieve higher food waste recycling rate and greater synergy with Tuas WRP’s operations. In addition, the IWMF’s automated Materials Recovery Facility will consolidate all recyclables collected under the NRP to achieve greater economies of scale, higher sorting efficiencies and recovery yields for various recyclable waste streams, such as metals, paper, and plastic. This will help boost Singapore’s overall recycling efforts and bring Singapore another step closer to realising its vision towards zero waste. These efforts are part of Singapore’s Zero Waste Masterplan, where targets have been set to strengthen Singapore’s climate, resource and economic resilience with an emphasis on a circular economy approach.

8          Mr Tan Meng Dui, Chief Executive Officer of NEA said, “Tuas Nexus is the world’s first greenfield project to harness the co-location synergies of two mega waste facilities for waste and water treatment. Besides being part of an integrated Tuas Nexus facility, the IWMF, on its own, will also be the largest, most advanced, efficient and integrated yet of our solid waste treatment facilities. The integrated facility shines the way for a more circular approach to resource management and, brings us one step closer to realising the vision of a Zero Waste Nation.”

Tuas Nexus Synergies

9          By employing the latest technologies, Tuas Nexus will harness the synergies (refer to Annex D for more info) of the water-energy-waste nexus from used water and solid waste. The by-product of one facility becomes a resource for the other facility. For example, IWMF’s Food Waste Treatment Facility will convert source segregated food waste into food waste slurry that is suitable for co-digestion with used water sludge at the Tuas WRP. The co-digestion of food waste and used water sludge will increase biogas production by 40 per cent at the Tuas WRP, compared to biogas yield from treatment of used water sludge alone. The biogas produced will then be combusted at the IWMF and the combustion heat energy recovered to improve the overall plant thermal efficiency and boost electricity generation. The electricity generated by IWMF will be used to sustain the operations of Tuas Nexus with excess to be exported to the grid. The excess electricity exported to the grid will be able to continually power up to 300,000 four-room HDB apartments. 

 Tuas Nexus Video

10        NEA and PUB have also released a video – featuring two young engineers from both agencies – that explains the benefits of Tuas Nexus and its importance to achieving a more sustainable future. The video can be viewed on NEA and PUB’s respective Facebook pages.  

~~ End ~~

For more information, please submit your enquiries electronically via the Online Feedback Form or  myENV mobile application. Alternatively, you contact us at 6225 5632.

 

ANNEX A

Artist’s Impression of Tuas Nexus

image 1

An artist's impression of Tuas Nexus which shows the co-location of the Integrated Waste Management Facility (IWMF) (left) and the Tuas Water Reclamation Plant (Tuas WRP) (right). Photo credit: PUB, Singapore’s National Water Agency

 

Infographic on Tuas Nexus

image 2

 

 

ANNEX B

About the Tuas Water Reclamation Plant (Tuas WRP)

Water demand in Singapore currently stands at 430 million gallons a day (mgd) – with population growth and economic development, this figure is expected to nearly double by 2060. PUB’s goal is to recycle every drop of used water, and the Deep Tunnel Sewerage System (DTSS) forms the backbone of our used water treatment system. Phase 1 of the project, which was completed in 2008, conveys used water from the eastern half of Singapore to PUB’s Changi Water Reclamation Plant, which is currently undergoing expansion. Construction of Phase 2 of the DTSS in western Singapore is currently underway and will be completed in tandem with Tuas WRP by 2025.

2          Tuas WRP will received used water flows by gravity via two separate deep tunnels – one to convey domestic used water and another for high-strength industrial used water. These two sources of water will be treated separately. The plant will be equipped with two energy-efficient membrane bioreactor systems to treat 650,000m3 (or 143 mgd) of domestic used water per day, which is then purified further to NEWater, and 150,000m3 (or 33 mgd) of industrial used water per day, which can be sent back to industries for reuse.  

 

image 3

 

Timeline of Tuas WRP development 

3          The first major process contract for the construction of Tuas WRP was awarded in July 2019, when Koh Brothers Building & Civil Engineering Contractor (Pte.) Ltd. and China Harbour (Singapore) Engineering Company Pte. Ltd. Joint Venture (JV) won the bid for the plant’s influent pumping stations (IPS). The IPS, which consist of five shafts extending up to 80 metres underground, will convey used water from the deep tunnels to the treatment units within Tuas WRP. In March this year, Sembcorp Design and Construction Pte Ltd was appointed to build the plant’s biosolids treatment facility, which will form the key interface between Tuas WRP and the IWMF. Most recently in June, PUB awarded the contract for the civil, structural and building services components of Tuas WRP’s Domestic Liquids Modules to Sinohydro Corporation Ltd (Singapore Branch).

4          Another seven construction tenders worth more than $1 billion will be called before the end of 2021, including for the plant’s Industrial Liquid Modules responsible for treating industrial used water.

DTSS Phase 2 

5          Phase 2 of the DTSS project consists of the following:

a) 40km of deep tunnels running under Ayer Rajah Expressway and ending at Tuas WRP. These consist of the South Tunnel, which conveys mainly domestic used water, and the Industrial Tunnel. Tunneling works have been underway since April 2019.

b) 60km of link sewers to create an interconnected network that channels used water from the existing sewerage system to the deep tunnels.

c) Tuas WRP and the integrated NEWater factory

6          With the completion of Phase 2 in 2025, two existing conventional water treatment plants located in Jurong and Ulu Pandan - as well as 37 intermediate pumping installations - will be progressively phased out. This will free up about 83 hectares of land for alternative uses.

 

ANNEX C

About the Integrated Waste Management Facility (IWMF) 

In 2019, a total of 7.23 million tonnes of solid waste was generated. While about 59 per cent of waste generated was recycled, the four Waste-to-Energy (WTE) plants in Singapore incinerated about 2.98 million tonnes in 2019. The amount of waste generated is expected to grow with an increasing population and economy. 

2          Unlike the existing WTE plants which only incinerate waste, the IWMF will adopt an integrated approach to process multiple waste streams for higher resource and energy recovery while reducing its environmental and land use footprint. The waste streams that IWMF will be handling include incinerable waste, household recyclables collected under the National Recycling Programme (NRP), source-segregated food waste and dewatered sludge from Tuas WRP. A summary of the treatment facilities and capacities is in the table below: 

Waste Treatment Facility Capacity (tonnes per day)
   
WTE Facility 5,800
Material Recovery Facility (MRF) 250
Food Waste Treatment Facility 400
Sludge Incineration Facility   800

 Table 1 – Summary of the tentative capacities for the treatment of the four waste streams at IWMF 

 

Timeline of IWMF Development 

3          IWMF will be developed in phases. The first phase of IWMF will be completed progressively from 2024 to 2025 while the whole facility is tentatively planned to be completed by 2028.  

4          Besides the use of natural ventilation and lighting, and green labelled building products, in the design and construction of the architectural façade, the IWMF will also integrate a viewing deck at its chimney to offer a bird’s eye view of the Tuas Nexus facility and the Tuas region, to all visitors for educational purposes.

5          NEA has appointed M/s Keppel Seghers - China Harbour Construction - ST Engineering Marine (KCS) Consortium as its Engineering, Procurement & Construction (EPC) Package 1 contractor. Under the contract, KCS Consortium will design, construct and commission a 2,900 tonnes per day (tpd) Waste-To-Energy (WtE) Facility and a 250 tpd Materials Recovery Facility (MRF) as part of IWMF Phase 1 development. A separate IWMF Phase 1 EPC contract will be awarded later this year for the development of a 800 tpd Sludge Incineration Facility and a 400 tpd Food Waste Treatment Facility. 

image 4

Waste Streams to be Treated at IWMF: 

Household Recyclables collected under NRP 

6          Public Waste Collectors (PWCs) are required to collect commingled recyclables (paper/cardboard, plastic, metal and glass) from all residential properties. Currently, the recyclables are sorted at the MRFs operated by PWCs before they are sent to the recycling plants.  

7          To optimise both process and land use efficiency, the sorting of recyclables will be consolidated and carried out at IWMF’s MRF. With better economies of scale and through the use of advanced automatic sorting equipment, the MRF will achieve a high yield of sorted recyclables.  

Food Waste 

8          In 2019, 744,000 tonnes of food waste were generated, of which 18 per cent was recycled. The rest of the food waste was disposed of at the WTE plants via incineration.  

9          Currently, food waste that is recycled is mainly homogenous food waste from food manufacturers such as spent yeast/grains from beer brewing, soya bean and bread waste. The food waste is segregated at source and sold to recyclers for conversion into animal feed. In addition, more than 50 premises, including hotels and schools, currently segregate and treat their food waste  on-site into compost for landscaping purposes or water for non-potable use.

10        As part of NEA’s overall waste management plan, several initiatives have been planned to help increase food waste recycling in Singapore. One of the initiatives is to collect food waste separately for treatment at the IWMF and subsequently co-digest with used water sludge at Tuas WRP.  

11        IWMF’s Food Waste Treatment Facility will be able to segregate the inorganic materials from the organic fractions before turning the latter into food waste slurry suitable for co-digestion with used water sludge at the Tuas WRP. The co-digestion of food waste and used water sludge will increase biogas production at the Tuas WRP. The biogas produced will be combusted at the IWMF to enhance its overall plant thermal efficiency and boost power production. 

Dewatered Sludge 

12        The IWMF will also be receiving dewatered sludge from the Tuas WRP for incineration at its Sludge Incineration Facility.  

13        Fluidised bed incineration technology will be adopted at IWMF’s Sludge Incineration Facility. 

Incinerable Waste

14        NEA has adopted WTE incineration to manage solid waste that is not recycled as it is able to reduce the volume of waste by 90 per cent and thereby, help Singapore conserve landfill space. Once completed, the IWMF will have an incineration capacity of 5,800 tonnes/day. 

 

ANNEX D

Tuas Nexus Synergies 

 
Material Handling Synergies
Synergy 1 Source-segregated food waste is processed at IWMF into bio-pulp for co-digestion with used water sludge at Tuas WRP to produce biogas. 
Synergy 2 Dewatered sludge is disposed of at IWMF for incineration and energy recovery. This eliminates the need to truck the dewatered sludge to another location for disposal and reduces the carbon footprint.
Synergy 3 Grit and screenings from Tuas WRP is sent to IWMF for thermal treatment. This eliminates the need for the grit to be trucked out to another location for disposal.
Energy Synergies
Synergy 4   Electricity generated by the Waste-to-Energy process will be used to power the operation of both IWMF and Tuas WRP, and the excess electricity will be exported to the grid.
Synergy 5 Steam from IWMF will be used at Tuas WRP for its Thermal Hydrolysis Process for pre-treatment of sludge, and for hot water generation for greasy waste treatment.
Synergy 6 Biogas from Tuas WRP is combusted at IWMF's external superheaters to enhance IWMF's power generation.
Water Synergies
Synergy 7 Treated effluent from Tuas WRP is sent to IWMF for its process needs.
Synergy 8 Condensate from the sludge drying process at IWMF is sent to Tuas WRP for used water treatment.
Synergy 9 Chilled water from IWMF is sent to Tuas WRP's administration building for cooling.

 









 
微信掃一掃關(guān)注中國水業(yè)網(wǎng)/>
</div>
<div   id= 
 
[ 行業(yè)資訊搜索 ]  [ ]  [ 打印本文 ]  [ 關(guān)閉窗口 ]

 
0條 [查看全部]  相關(guān)評論

 
推薦圖文
直播|沙特全球水務(wù)創(chuàng)新獎路演發(fā)布會 直播時間:2024年9月27日(周五)10:45—12:15 2024-09-27 10:45:00 開始 蘇伊士工業(yè)園區(qū)綠色低碳環(huán)境治理方案 直播時間:2024年9月30日(周一)9:30—11:30 2024-09-30 09:30:00 開始
主 講 人:江峰 教授/博士生導(dǎo)師  主講報告:硫基生物技術(shù)助力廢水低碳處理  時間:2024年9月14日(周六),10:00-11:00          主講人:江峰  中山大學(xué)環(huán)境科學(xué)與工程學(xué)院 水質(zhì)安全與高品質(zhì)供水研討會 直播時間:2024年8月30日(周五)13:30—17:30 2024-08-30 13:30:00 開始
先進(jìn)水技術(shù)博覽(Part 16)| 紫外線水處理技術(shù)探索與實踐 直播時間:2024年8月31日(周六)上午10:00-11:00 2024-08-31 10:00:00 開始 肖威中博士--美國污水處理概述 直播時間:2024年9月2日(周一)20:30—22:00 2024-09-02 20:30:00 開始
北京市科協(xié)青年科技人才跨界交流活動--活動主題:AI時代的污水資源化應(yīng)用創(chuàng)新  涉及領(lǐng)域:污水資源化、人工智能、物聯(lián)網(wǎng)  召集人:曹效鑫 博士  活動時間:8月21日下午  活動地點:北京未來設(shè)計園區(qū) 報告人:程忠紅,蘇伊士亞洲 高級技術(shù)推廣經(jīng)理 直播題目:污泥干化技術(shù)的選擇  內(nèi)容: 	不同干化設(shè)備的特點及適用性 	污泥干化系統(tǒng)的選擇依據(jù) 	干化在污
中國水協(xié)團(tuán)體標(biāo)準(zhǔn)《城鎮(zhèn)污水處理廠碳減排評估標(biāo)準(zhǔn)》宣貫會通知  報告人:王秀蘅 哈爾濱工業(yè)大學(xué)教授  博士生導(dǎo)師直播時間:2024年7月17(周三)14:00-16:00 2024-07-17 14:0 蘇伊士 程忠紅 :反硝化濾池在污水脫氮中的差異化應(yīng)用 直播時間:2024年7月2日(周二)14:00—16:00 2024-07-02 14:00:00 開始
先進(jìn)水技術(shù)博覽(Part 15)|低碳型裝配式污水廠探索與實踐 直播時間:2024年6月29日(周六)上午10:00-11:00 2024-06-29 10:00:00 開始 吳迪   博士: 百年持續(xù)迭代,新型生物膜工藝在提質(zhì)增效、督察常態(tài)化背景下的典型應(yīng)用 直播時間:2024年6月20日(周四)14:00—16:00 2024-06-20 14:00:00 開始
Paul Westerhoff院士、王鵬教授等人領(lǐng)銜空氣取水學(xué)術(shù)與科技高端論壇 直播時間:2024年6月8日(周六)08:50 2024-06-08 08:50:00 開始 報告題目:《湖南省排水系統(tǒng)溢流控制技術(shù)導(dǎo)則》解讀及相關(guān)技術(shù)探討  報告人簡介:  尹華升,男,教授級高級工程師,湖南省建筑科學(xué)研究院副總工程師、湖南省非開挖工程技術(shù)研究中心主任,湖南排水協(xié)會副秘書長;
Water & Ecology Forum: 水與生態(tài)新起點 直播時間:2024年5月24日(周三)14:30 2024-05-24 14:30:00 開始 中國水環(huán)境治理存在的問題及發(fā)展方向 直播時間:2024年5月28日(星期二)14:00—16:00 2024-05-28 14:00:00 開始
5月22日下午丨《城鎮(zhèn)排水管網(wǎng)系統(tǒng)診斷技術(shù)規(guī)程》宣貫會 直播時間:2024年5月22日(周三)14:00-16:00 2024-05-22 14:00:00 開始 雙碳背景下污泥處置資源化路徑探索--杜炯  教授級高級工程師,上海市政工程設(shè)計研究總院(集團(tuán))有限公司第四設(shè)計院總工程師,注冊公用設(shè)備工程師、注冊咨詢工程師(投資),上海土木工程學(xué)會會員、復(fù)旦大學(xué)資源
JWPE 網(wǎng)絡(luò)報告/用于快速現(xiàn)場廢水監(jiān)測的折紙微流體裝置 直播時間:2024年5月13日(星期一)19:00 2024-05-13 19:00:00 -楊竹根  英國克蘭菲爾德大學(xué)教授、高級傳感器實驗 紫外光原位固化法管道修復(fù)全產(chǎn)業(yè)鏈質(zhì)量控制倡議 直播時間:2024年5月7日(星期二)9:00-16:30 2024-05-07 09:00:00 開始
華北院 馬洪濤 副總工:系統(tǒng)化全域推進(jìn)海綿城市建設(shè)的應(yīng)與不應(yīng)——海綿城市建設(shè)正反案例1 直播時間:2024年4月30日(周二)9:30 2024-04-30 09:30:00 開始 高效納濾膜:中空纖維納濾膜的特點與應(yīng)用 直播時間:2024年4月27日(周六)10:00-11:00 2024-04-27 10:00:00 開始-先進(jìn)水技術(shù)博覽(Part 14)
聚力水務(wù)科技創(chuàng)新、中德研討推進(jìn)行業(yè)高質(zhì)量發(fā)展 ——特邀德國亞琛工業(yè)大學(xué)Max Dohman 直播時間:2024年4月14日(周日)15:00 2024-04-14 15:00:00 開始 康碧熱水解高級厭氧消化的全球經(jīng)驗和展望 | 北京排水集團(tuán)高安屯再生水廠低碳運營實踐與探索 直播時間:2024年4月10日(周三)14:00—16:00 2024-04-10 14:00:00 開始
世界水日,與未來新水務(wù)在深圳約一個高峰論壇 直播時間:2024年3月22日(周五)08:30—17:30 2024-03-22 08:30:00 開始 中國給水排水直播:直播時間:2024年3月14日(周四)14:00 2024-03-14 14:00:00 開始    題目:占地受限情況下的污水廠水質(zhì)提升解決方案 主講人:程忠紅, 蘇伊士亞洲 高級
華北設(shè)計院:高密度建成區(qū)黑臭水體整治效果鞏固提升要點分析 直播時間:2024年3月4日(周一)9:30 2024-03-04 09:30:00 開始 2月23日|2024年“云學(xué)堂科技學(xué)習(xí)周”暨第一屆粵港澳大灣區(qū)青年設(shè)計師技術(shù)交流與分享論壇 直播時間:2024年2月23日(星期五)9:00—17:00 2024-02-23 09:00:00 開始
2月22日|2024年“云學(xué)堂科技學(xué)習(xí)周”暨第一屆粵港澳大灣區(qū)青年設(shè)計師技術(shù)交流與分享論壇 直播時間:2024年2月22日(星期四)9:00—18:00 2024-02-22 09:00:00 開始 2月21日|2024年“云學(xué)堂科技學(xué)習(xí)周”暨第一屆粵港澳大灣區(qū)青年設(shè)計師技術(shù)交流與分享論壇 直播時間:2024年2月21日(星期三)9:00—18:00 2024-02-21 09:00:00 開始
大灣區(qū)青年設(shè)計師論壇直播預(yù)告(第一屆粵港澳大灣區(qū)青年設(shè)計師技術(shù)交流論壇)  “醒年盹、學(xué)好習(xí)、開新篇”2024年“云學(xué)堂科技學(xué)習(xí)周”暨第一屆粵港澳大灣區(qū)青年設(shè)計師技術(shù)交流與分享論壇 山東日照:“鄉(xiāng)村之腎”監(jiān)管裝上“智慧芯”    日照市生態(tài)環(huán)境局農(nóng)村辦負(fù)責(zé)人時培石介紹,農(nóng)村生活污水處理系統(tǒng)被稱為“鄉(xiāng)村之腎”,對于農(nóng)村水環(huán)境的改善發(fā)揮著重要作用
人工濕地國際大咖/西安理工大學(xué)趙亞乾教授:基于人工濕地技術(shù)的污水凈化之路 直播時間:2024年1月30日(星期二)19:00 2024-01-30 19:00:00 開始 馬洪濤院長:城市黑臭水體治理與污水收集處理提質(zhì)增效統(tǒng)籌推進(jìn)的一些思考 直播時間:2024年1月25日 10:00 2024-01-25 10:00:00 開始
2024年水務(wù)春晚 直播時間:2024年1月18日(周四)18:00—22:00 2024-01-18 18:00:00 開始 《以物聯(lián)網(wǎng)技術(shù)打造新型排水基礎(chǔ)設(shè)施》 直播時間:2024年1月11日(星期四)15:00 2024-01-11 15:00:00 開始--劉樹模,湖南清源華建環(huán)境科技有限公司董事長,清華大學(xué)碩士研究生
WPE網(wǎng)絡(luò)報告:作者-審稿-編輯視野下的高水平論文 直播時間:2024年1月10日(星期三)19:00 2024-01-10 19:00:00 開始 核心期刊:中國給水排水》繼續(xù)入編北大《中文核心期刊要目總覽》 中國給水排水核心科技期刊
直播丨《城鎮(zhèn)供水管網(wǎng)漏損控制及評定標(biāo)準(zhǔn)》宣貫會 直播時間:2023年12月27日 09:30—11:00 2023-12-27 12:00:00 開始 【直播】【第五屆水利學(xué)科發(fā)展前沿學(xué)術(shù)研討會】王浩院士:從流域視角看城市洪澇治理與海綿城市建設(shè)
先進(jìn)水技術(shù)博覽(Part 13)|水回用安全保障的高效監(jiān)測技術(shù) 中國城鎮(zhèn)供水排水協(xié)會城鎮(zhèn)水環(huán)境專業(yè)委員會2023年年會暨換屆大會 直播時間:2023年12月16日(周六)08:30—18:00 2023-12-16 08:30:00 開始
第二屆歐洲華人生態(tài)與環(huán)境青年學(xué)者論壇-水環(huán)境專題 直播時間:2023年12月9日(周六)16:00—24:00 2023-12-09 16:00:00 開始 JWPE網(wǎng)絡(luò)報告:綜述論文寫作的一點體會 直播時間:2023年11月30日(星期四)19:00 2023-11-30 19:00:00 開始
WaterInsight第9期丨強志民研究員:紫外線水消毒技術(shù) 再生水 水域生態(tài)學(xué)高端論壇(2023)熱帶亞熱帶水生態(tài)工程教育部工程研究中心技術(shù)委員會會議 直播時間:2023年11月29日(周三) 09:00—17:40 2023-11-29 09:00:00 開始
中國給水排水直播:智慧水務(wù)與科技創(chuàng)新高峰論壇 直播時間:2023年11月25日(周六) 13:30 2023-11-25 13:30:00 開始 中國水協(xié)團(tuán)體標(biāo)準(zhǔn)《城鎮(zhèn)污水資源與能源回收利用技術(shù)規(guī)程》宣貫會通知 中國城鎮(zhèn)供水排水協(xié)會
2023年11月14日9:00線上舉行直播/JWPE網(wǎng)絡(luò)報告:提高飲用水安全性:應(yīng)對新的影響并識別重要的毒性因素 直播主題:“對癥下藥”解決工業(yè)園區(qū)污水處理難題   報告人:陳智  蘇伊士亞洲 技術(shù)推廣經(jīng)理 直播時間:2023年11月2日(周四)14:00—16:00 2023-11-02 14:00:00 開始
10月29日·上海|市政環(huán)境治理與水環(huán)境可持續(xù)發(fā)展論壇 BEST第十五期|徐祖信 院士 :長江水環(huán)境治理關(guān)鍵      直播時間:2023年10月26日(周四)20:00—22:00 2023-10-26 20:00:00 開始
《水工藝工程雜志》系列網(wǎng)絡(luò)報告|學(xué)術(shù)論文寫作之我見 直播時間:2023年10月19日(周四)19:00 2023-10-19 19:00:00 開始 污水處理廠污泥減量技術(shù)研討會 直播時間:2023年10月20日13:30-17:30 2023-10-20 13:30:00 開始
技術(shù)沙龍 | 先進(jìn)水技術(shù)博覽(Part 12) 直播時間:10月14日(周六)上午10:00-12:00 2023-10-14 10:00:00 開始 直播題目:蘇伊士污泥焚燒及零碳足跡概念污泥廠 主講人:程忠紅 蘇伊士亞洲 技術(shù)推廣經(jīng)理  內(nèi)容包括: 1.	SUEZ污泥業(yè)務(wù)產(chǎn)品介紹 2.	全球不同焚燒項目介紹 3.	上海浦東污泥焚燒項目及運營情況
中國給水排水第十四屆中國污泥千人大會參觀項目之一:上海浦東新區(qū)污水廠污泥處理處置工程 《水工藝工程雜志》系列網(wǎng)絡(luò)報告 直播時間:2023年9月26日 16:00  王曉昌  愛思唯爾期刊《水工藝工程雜志》(Journal of Water Process Engineering)共同主
中國給水排水2024年污水處理廠提標(biāo)改造(污水處理提質(zhì)增效)高級研討會(第八屆)邀請函暨征稿啟事  同期召開中國給水排水2024年排水管網(wǎng)大會  (水環(huán)境綜合治理)  同期召開中國給水排水 2024年 海綿城市標(biāo)準(zhǔn)化產(chǎn)業(yè)化建設(shè)的關(guān)鍵內(nèi)容 結(jié)合項目案例,詳細(xì)介紹海綿城市建設(shè)的目標(biāo)、技術(shù)體系及標(biāo)準(zhǔn)體系,探討關(guān)鍵技術(shù)標(biāo)準(zhǔn)化產(chǎn)業(yè)化建設(shè)的路徑,提出我國海綿城市建設(shè)的發(fā)展方向。
報告題目:《城鎮(zhèn)智慧水務(wù)技術(shù)指南》   中國給水排水直播平臺: 主講人簡介:  簡德武,教授級高級工程師,現(xiàn)任中國市政工程中南設(shè)計研究總院黨委委員、副院長,總院技術(shù)委員會副主任委員、信息技術(shù)委員會副主 第一輪通知 | 國際水協(xié)第18屆可持續(xù)污泥技術(shù)與管理會議 主辦單位:國際水協(xié),中國科學(xué)院  聯(lián)合主辦單位:《中國給水排水》雜志社 等
技術(shù)沙龍 | 先進(jìn)水技術(shù)博覽(Part 11) 直播時間:8月19日(周六)上午10:00-12:00 2023-08-19 10:00:00  廣東匯祥環(huán)境科技有限公司  湛蛟  技術(shù)總監(jiān)  天津萬 中國水業(yè)院士論壇-中國給水排水直播平臺(微信公眾號cnww1985):自然—社會水循環(huán)與水安全學(xué)術(shù)研討會
WaterInsight第7期丨掀浪:高鐵酸鉀氧化技術(shù)的機理新認(rèn)知及應(yīng)用 直播時間:2023年8月5日(周六)上午10:00-11:00 2023-08-05 10:00:00 開始 直播:“一泓清水入黃河”之山西省再生水產(chǎn)業(yè)化發(fā)展專題講座 直播時間:2023年7月23日(周日 )08:00-12:00 2023-07-23 08:00:00 開始
珊氮自養(yǎng)反硝化深度脫氮技術(shù)推介會 直播時間:2023年7月21日(周五) 歐仁環(huán)境顛覆性技術(shù):污水廠擴容“加速跑”(原有設(shè)施不動,污水處理規(guī)模擴容1倍!出水水質(zhì)達(dá)地表水準(zhǔn)IV類標(biāo)準(zhǔn)。,推動污水治理提質(zhì)增效。  誠征全國各地污水廠提標(biāo)擴容工程需求方(水務(wù)集團(tuán)、BOT公司、設(shè)
直播預(yù)告|JWPE網(wǎng)絡(luò)報告:自然系統(tǒng)中難降解污染物去除的物化與生化作用及水回用安全保障 中國給水排水 直播題目: 高排放標(biāo)準(zhǔn)下污水中難降解COD的去除技術(shù)     報告人:蘇伊士亞洲 技術(shù)推廣經(jīng)理 程忠紅
WaterTalk|王凱軍:未來新水務(wù) 一起向未來  For and Beyond Water 中國環(huán)境科學(xué)學(xué)會水處理與回用專業(yè)委員會以網(wǎng)絡(luò)會議形式舉辦“水與發(fā)展縱論”(WaterTalk)系列學(xué)術(shù)報 5月18日下午 14:00—16:00 直播  題目: 高密度沉淀池技術(shù)的迭代更新 主講人: 程忠紅 蘇伊士亞洲 技術(shù)推廣經(jīng)理  大綱:  高密池技術(shù)原理 不同型號高密池的差異和應(yīng)用區(qū)別 高密池與其他
BEST|綠色低碳科技前沿與創(chuàng)新發(fā)展--中國工程院院士高翔教授  直播時間:2023年4月30日 14:00—16:00 2023-04-30 14:00:00 開始 日照:“碳”尋鄉(xiāng)村振興“綠色密碼”  鳳凰網(wǎng)山東    鄉(xiāng)村生態(tài)宜居,鄉(xiāng)村振興的底色才會更亮。我市堅持鄉(xiāng)村建設(shè)與后續(xù)管護(hù)并重,市、區(qū)、鎮(zhèn)聯(lián)
BEST論壇講座報告第十三期(cnwww1985):全球碳預(yù)算和未來全球碳循環(huán)的不穩(wěn)定性風(fēng)險 The global carbon budget and risks of futur 國際水協(xié)IWA 3月17日直播:3月17日 國際水協(xié)IWA創(chuàng)新項目獎PIA獲獎項目介紹分享會 直播時間:2023年3月17日 9:00—11:30 2023-03-17 09:00:00 開始
中國給水排水直播:云中漫步-融合大數(shù)據(jù)、人工智能及云計算的威立雅智慧水務(wù)系統(tǒng)Hubgrade 直播時間:2023年3月15日 中國給水排水直播平臺會議通知 | 2023污泥處理處置技術(shù)與應(yīng)用高峰論壇(清華大學(xué)王凱軍教授團(tuán)隊等)
中國污水千人大會參觀項目之一: 云南合續(xù)環(huán)境科技股份有限公司  海口市西崩潭水質(zhì)凈化中心 中國給水排水 Water Insight直播:劉銳平  清華大學(xué) 環(huán)境學(xué)院 教授 博士生導(dǎo)師—高濃度硝酸鹽廢水反硝化脫氮過程強化原理與應(yīng)用 會議時間:2023.1.7(周六)10:00—11:00
智慧水務(wù)的工程全生命周期實踐分享 直播時間:2023年1月6日 15:00-16:00 對話嘉賓:竇秋萍  華霖富水利環(huán)境技術(shù)咨詢(上海)有限公司  總經(jīng)理 主持人:李德橋   歐特克軟件(中國)有限 蘇伊士 直播時間:12月30日14:00-16:00直播題目:污泥處理處置的“因地制宜和因泥制宜” 主講人:程忠紅,蘇伊士亞洲  技術(shù)推廣經(jīng)理 特邀嘉賓:劉波 中國市政工程西南設(shè)計研究總院二院總工 教
蘇伊士 直播時間:12月27日14:00-16:00;復(fù)雜原水水質(zhì)下的飲用水解決方案    陳智,蘇伊士亞洲,技術(shù)推廣經(jīng)理,畢業(yè)于香港科技大學(xué)土木與環(huán)境工程系,熟悉市政及工業(yè)的給水及污水處理,對蘇伊士 曲久輝  中國工程院院士,美國國家工程院外籍院士,發(fā)展中國家科學(xué)院院士;清華大學(xué)環(huán)境學(xué)院特聘教授、博士生導(dǎo)師;中國科學(xué)院生態(tài)環(huán)境研究中心研究員
基于模擬仿真的污水處理廠數(shù)字化與智慧化:現(xiàn)狀與未來 直播時間:2022年12月28日(周三)9:30—12:00 2022城鎮(zhèn)溢流污染控制高峰論壇|聚焦雨季溢流污染控制的技術(shù)應(yīng)用與推廣 中國給水排水
王愛杰 哈爾濱工業(yè)大學(xué)教授,國家杰青,長江學(xué)者,國家 領(lǐng)軍人才:廣州大學(xué)學(xué)術(shù)講座|低碳水質(zhì)凈化技術(shù)及實踐 直播時間:2022年12月18日 9:30 國際水協(xié)會哥本哈根世界水大會成果分享系列網(wǎng)絡(luò)會議 直播時間:2022年12月15日 20:00—22:00
德國專場直播主題:2022 中國沼氣學(xué)術(shù)年會暨中德沼氣合作論壇 2022 中國沼氣學(xué)術(shù)年會暨中德沼氣合作論壇德國專場 時間:2022年12月20日  下午 15:00—17:00(北京時間) 2022中國沼氣學(xué)會學(xué)術(shù)年會暨第十二屆中德沼氣合作論壇的主論壇將于12月15日下午2點召開
技術(shù)交流 | 德國污水處理廠 計算系列規(guī)程使用介紹 城建水業(yè) WaterInsight首期丨王志偉教授:膜法水處理技術(shù)面臨的機遇與挑戰(zhàn) 直播時間:2022年12月10日 10:00—11:00
處理工藝專場|水業(yè)大講堂之六——城市供水直飲安全和智慧提質(zhì) 直播時間:2022年12月8日 8:30—12:15 建設(shè)管理專場|水業(yè)大講堂之六——城市供水直飲安全和智慧提質(zhì) 直播時間:2022年12月7日 14:00—17:15
國際水協(xié)會哥本哈根世界水大會成果分享系列網(wǎng)絡(luò)會議 直播時間:2022年12月8日 20:00—22:00 Training Course for Advanced Research & Development of Constructed Wetland Wastewater Treatment Tech
12月3日|2022IWA中國漏損控制高峰論壇 直播時間:2022年12月3日(周六)9:00—17:00 2022-12-03 09:00:00 開始 國際水協(xié)會哥本哈根世界水大會成果分享系列網(wǎng)絡(luò)會議(第八期) 直播時間:2022年12月1日 20:00—22:00 2022-12-01 20:00:00 開始
中國給水排水直播:智慧輸配專場|水業(yè)大講堂之六——城市供水直飲安全和智慧提質(zhì) 直播時間:2022年11月30日 14:00—17:05 2022-11-30 14:00:00 開始 國際水協(xié)會哥本哈根世界水大會成果分享系列網(wǎng)絡(luò)會議(第七期) 直播時間:2022年11月25日 20:00—22:00 2022-11-25 20:00:00 開始
推薦行業(yè)資訊
點擊排行